This article reports that it will have 60 beds, be located 200 m ”off camino” .
2.6million € grant from EU, which is projected to take care of most of the cost.
Opening date, hopefully spring 2024.
And here’s another article with drawings.
2.6million € grant from EU, which is projected to take care of most of the cost.
Opening date, hopefully spring 2024.
And here’s another article with drawings.